top of page

Projects

Before
Outdoor riding arena - before

During
Outdoor riding arena - during construction

riding arena after
Outdoor riding arena - after construction

Before
Outdoor riding arena - before
1/3
Recent examples:
-
Construction of a 5.5 million barrel freshwater holding pond.
-
Construction of a 2.5 million barrel freshwater holding pond
-
Demolition and reclamation of a 96,000 head swine facility
-
Excavation of a short-range radar station
Fresh Water Holding Pond
-
383,000 barrel pond
-
Stripped 4,000 yards of topsoil
-
Excavated 40,765 yards of dirt

Before
Fresh water holding pond - before.

After
Freshwater holding pond after construction

Before
Fresh water holding pond - before.
1/2
"Grassy Knoll"
-The demolition and reclamation of a
96,000-head swine facility.

Grassy Knoll Before
Grassy Knoll Before

Grassy Knoll After
Grassy Knoll After

Grassy Knoll Before
Grassy Knoll Before
1/2
bottom of page